Design the Coastline

  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About
  • Gallery

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Home Inspections for buyers and sellers 949-740-4185

The 350.00 per hour will be credit towards approved plans fe

send us a free message 24/7

Connect with Bob Austin Never Enough Overtime B570642

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Never Enough Overtime

Our Experience

NEVER ENOUGH OVERTIME 949-740-4185

GENERAL CONTRACTORS

Luxury Coastal Homes • Remodels • Multi-Family Construction

ROBERT “BOB” AUSTIN
Licensed California General Contractor • B570642
Building Since 1980

OLD-SCHOOL EXPERIENCE.

HANDS-ON DAILY SUPERVISION.

QUALITY BUILT TO LAST.

With over 45 years of construction experience, NEVER ENOUGH OVERTIME specializes in luxury custom homes, coastal construction, remodels, additions, and multi-family projects throughout Southern California.

Unlike many contractors, Bob Austin personally oversees every project daily — coordinating subcontractors, scheduling inspections, reviewing plans, and ensuring high-quality craftsmanship from start to finish.

SERVICES PROVIDED

✔ Custom Home Construction
✔ Luxury Coastal Homes
✔ Kitchen & Bathroom Remodels
✔ Home Additions & ADUs
✔ Multi-Family Construction
✔ Structural Repairs
✔ Roofing & Waterproofing
✔ Site Development & Grading
✔ Concrete & Foundations
✔ Framing & Finish Carpentry
✔ Project Management
✔ Architect & Engineer Coordination
✔ Outdoor Living Spaces
✔ Demolition & Site Preparation
✔ Tenant Improvements & Remodels

EXPERIENCE YOU CAN TRUST

  • Luxury homes in Newport Beach & Corona del Mar
  • Condo & apartment developments
  • Site demolition, grading & underground utilities
  • Hands-on superintendent experience
  • Trusted subcontractor network
  • Strong communication with homeowners & architects
  • Detailed scheduling and project coordination

AREAS SERVED

Newport Beach
Corona del Mar
Laguna Beach
Huntington Beach
Irvine
Dana Point
Palm Desert
Indian Wells

CONTACT

BOB AUSTIN

NEVER ENOUGH OVERTIME GENERAL CONTRACTORS

📞 949-740-4185
📞 928-733-0756

📧 neverenoughovertime@gmail.com

Instagram: @never_enough_overtime_gc_





ARCHITECTS AND ENGINEERS

We will design and build with our architects or yours and designer and we help with the design 


Please email for our complete list

Our Construction fees

Building starts here and why hire a GC Bob Austin

CONFIDENTIALITY NOTICE & COPYRIGHT DISCLAIMER

This flyer, advertisement, email, and all related materials are confidential and intended only for the recipient of this information. No portion may be copied, distributed, reproduced, shared, or used without the written permission of Bob Austin and Never Enough Overtime.

Copyright © 2026 Never Enough Overtime. All Rights Reserved.
Date: May 9, 2026

All information, renderings, photos, concepts, and design ideas contained herein are compiled from public records, publicly available real estate listings, Homes.com, social media websites, prior construction experience, and conceptual design ideas intended for discussion purposes only.

This property may be listed for sale by others and is not represented, owned, or offered for sale by Bob Austin or Never Enough Overtime.

All renderings, remodel concepts, construction ideas, elevations, floor plans, sketches, and improvement suggestions are for marketing and conceptual purposes only and shall not be relied upon as final architectural, engineering, structural, legal, or permitting documents. Buyer shall verify all information independently with licensed professionals and local building departments.

Use of this flyer or any portion of its contents for solicitation, marketing, advertising, open houses, investor presentations, or commercial use without permission is prohibited.

Design and consulting fees:

  • $250.00 per hour design consultation fee
  • $250.00 per flyer copy for solicitation or marketing use
  • 30-page presentation packages available upon request with 7 days notice

building fees for new construction


Construction consulting and supervision services:

  • $12,000.00 per month construction supervision
  • 5% markup on all construction, subcontractor contracts, and building costs
  • Cost-plus construction management structure

Example:

  • $2,000,000 construction project
  • 5% overhead and management fee = $100,000
  • 12-month supervision fee = $144,000 total ($12,000/month)

Bob Austin is a licensed California General Contractor, License No. B570642, providing hands-on jobsite management from project start to completion. We prefer direct owner involvement and do not typically hire superintendents. We welcome collaboration with clients, designers, architects, realtors, investors, and referral partners.

For permission to use this flyer or to schedule consulting services, contact:

Bob Austin
Never Enough Overtime
California General Contractor License B570642
Phone: 949-740-4185
Email: neverenoughovertime@gmail.com


of course all fees and cost can be discussed per each job and contract

Building starts here and why hire a GC Bob Austin

Building starts here and why hire a GC Bob Austin

Building starts here and why hire a GC Bob Austin

CALIFORNIA CUSTOM WATERFRONT HOME

COMPLETE CONSTRUCTION MATERIAL LIST

BUYER / SELLER REMODEL QUESTIONNAIRE

CITY PERMIT & ICC CODE CHECKLIST

Prepared For:
Never Enough Overtime Contractors
Bob Austin – CA License B570642
949-740-4185

Project Concept:
16104 Tortola Cir
Huntington Beach, CA 92649
Custom 2 Story Waterfront Remodel
Approx. 2,571 Sq Ft

IMPORTANT NOTICE

This document is a conceptual construction planning guide only.
Final plans, engineering, Title 24, structural calculations, soils reports, energy compliance, coastal review, and permit drawings must be prepared and stamped by licensed California professionals before submission to the City of Huntington Beach.

All construction must comply with:

  • California Building Code (CBC)
  • California Residential Code (CRC)
  • California Electrical Code (CEC)
  • California Plumbing Code (CPC)
  • California Mechanical Code (CMC)
  • California Fire Code (CFC)
  • California Green Building Standards Code (CALGreen)
  • California Energy Code Title 24
  • Local Huntington Beach requirements
  • Coastal Commission requirements
  • ICC International Building Code standards

PHASE 1 – PRE-CONSTRUCTION & DESIGN

Professional Services

  • Architect
  • Structural engineer
  • Civil engineer
  • Soils engineer
  • Surveyor
  • Geotechnical consultant
  • Coastal consultant
  • MEP engineer
  • Landscape architect
  • Pool engineer
  • Energy consultant Title 24
  • Interior designer
  • General contractor
  • Permit expeditor
  • Environmental consultant
  • Insurance provider

Site Investigation

  • Property survey
  • Topographic survey
  • Utility locate
  • Soils testing
  • Existing sewer inspection
  • Existing dock inspection
  • Flood elevation review
  • Harbor setback verification
  • Easement review
  • Coastal restrictions review

Permit Documents Needed

  • Site plan
  • Architectural plans
  • Structural calculations
  • Truss calculations
  • Energy calculations
  • Mechanical plans
  • Electrical plans
  • Plumbing plans
  • Drainage plans
  • Landscape plans
  • Pool plans
  • Fire sprinkler plans
  • Coastal approval package
  • Stormwater BMP plan
  • Waste management plan

PHASE 2 – DEMOLITION

Demolition Materials & Equipment

  • Demo dumpsters
  • Portable toilets
  • Temporary fencing
  • Dust barriers
  • Safety cones
  • Erosion control wattles
  • Silt fencing
  • Excavator
  • Skid steer
  • Jackhammers
  • Concrete saws
  • Dump trailers
  • Temporary power poles
  • Temporary water supply

Demo Scope

  • Remove existing drywall
  • Remove roofing
  • Remove windows
  • Remove doors
  • Remove cabinets
  • Remove plumbing fixtures
  • Remove electrical wiring
  • Remove flooring
  • Remove landscaping
  • Remove concrete flatwork
  • Remove pool equipment if needed
  • Remove damaged framing

PHASE 3 – SITE WORK & FOUNDATION

Excavation

  • Excavator rental
  • Soil export trucks
  • Compaction equipment
  • Base rock
  • Gravel
  • Drain rock
  • Geo fabric

Foundation Materials

  • Rebar #4
  • Rebar #5
  • Rebar #6
  • Anchor bolts
  • Hold downs
  • Simpson Strong-Tie hardware
  • Vapor barrier
  • Concrete forms
  • Form stakes
  • Form release oil
  • Concrete pump
  • Ready mix concrete
  • Footing drains
  • Waterproofing membrane
  • Expansion joint material
  • Slab insulation
  • Copper grounding rod
  • Ufer ground rebar

Underground Utilities

  • ABS sewer pipe
  • PVC drain pipe
  • Copper water pipe
  • Gas pipe
  • Electrical conduit
  • Low voltage conduit
  • Irrigation sleeves
  • Catch basins
  • Area drains
  • Trench drains
  • Cleanouts

PHASE 4 – STRUCTURAL FRAMING

Lumber Materials

Foundation & Floor Framing

  • Pressure treated sill plates
  • 2x6 studs
  • 2x8 joists
  • 2x10 joists
  • 2x12 joists
  • LVL beams
  • PSL beams
  • Glue laminated beams
  • Rim joists
  • Blocking
  • Bridging
  • Floor sheathing plywood

Wall Framing

  • 2x4 walls
  • 2x6 exterior walls
  • Headers
  • King studs
  • Jack studs
  • Cripple studs
  • Fire blocking
  • Structural sheathing
  • Shear wall plywood
  • Nailing hardware

Roof Framing

  • Roof rafters
  • Roof trusses
  • Ridge beams
  • Hip rafters
  • Valley rafters
  • Roof blocking
  • Fascia boards
  • Roof sheathing
  • Hurricane clips
  • Structural connectors

Steel Materials

  • W8 steel beams
  • W10 steel beams
  • W12 steel beams
  • Steel posts
  • Steel plates
  • Moment frames
  • Knife plates
  • Steel weld plates
  • Anchor plates
  • Simpson hardware
  • Structural bolts

Framing Hardware

  • Joist hangers
  • HD hold downs
  • Strap ties
  • Framing nails
  • Structural screws
  • SDS screws
  • Epoxy anchors
  • Seismic clips

PHASE 5 – WINDOWS, DOORS & WATERPROOFING

Windows

  • Black aluminum windows
  • Tempered glass
  • Low-E glass
  • Sliding glass doors
  • Bathroom privacy windows
  • Skylights
  • Glass railing systems

Exterior Doors

  • Front entry pivot door
  • French doors
  • Pocket doors
  • Garage entry doors
  • Waterproof thresholds

Waterproofing

  • Self adhered membrane
  • Flashing tape
  • Liquid waterproofing
  • Window pans
  • Metal flashing
  • Copper flashing
  • Waterproof deck coating
  • Drain mat systems
  • Caulking
  • Sealants

PHASE 6 – ROOFING

Roofing Materials

  • Clay roof tile
  • Concrete roof tile
  • Metal roofing
  • Copper chimney caps
  • Roof underlayment
  • Ice shield membrane
  • Roof vents
  • Ridge vents
  • Roof flashing
  • Gutters
  • Downspouts
  • Scuppers
  • Overflow drains
  • Copper drains

PHASE 7 – PLUMBING

Plumbing Rough

  • Copper piping
  • PEX piping
  • ABS waste lines
  • Gas lines
  • Hose bibs
  • Main water shutoff
  • Pressure regulators
  • Tankless water heater
  • Recirculation pump
  • Shower valves
  • Floor drains
  • Cleanouts
  • Backflow preventers

Plumbing Fixtures

  • Toilets
  • Bathtubs
  • Freestanding tubs
  • Faucets
  • Kitchen sinks
  • Bar sinks
  • Shower heads
  • Body sprays
  • Exterior shower
  • Pool plumbing
  • Spa plumbing

PHASE 8 – ELECTRICAL

Main Electrical

  • Main service panel
  • Sub panels
  • Meter panel
  • Grounding system
  • Copper grounding wire
  • Electrical conduit
  • Romex wire
  • MC cable
  • Exterior disconnects

Electrical Fixtures

  • Recessed lights
  • Pendant lights
  • Chandeliers
  • Exterior sconces
  • Landscape lights
  • Dock lighting
  • Motion sensors
  • Ceiling fans
  • Bathroom exhaust fans
  • TV wiring
  • Audio speakers
  • Smart home systems
  • Security cameras
  • EV chargers

PHASE 9 – HVAC & MECHANICAL

HVAC Materials

  • HVAC units
  • Mini split systems
  • Ductwork
  • Insulated flex duct
  • Supply registers
  • Return air grills
  • Thermostats
  • Ventilation fans
  • Exhaust vents
  • Condensate drains
  • Sound attenuation systems

PHASE 10 – INSULATION & DRYWALL

Insulation

  • Batt insulation
  • Rigid insulation
  • Spray foam insulation
  • Sound insulation
  • Attic insulation

Drywall

  • 5/8 drywall
  • Moisture resistant drywall
  • Cement board
  • Corner bead
  • Joint compound
  • Texture materials

PHASE 11 – STUCCO & EXTERIOR FINISHES

Stucco Materials

  • Building paper
  • Lath wire
  • Weep screed
  • Expansion joints
  • Stucco scratch coat
  • Brown coat
  • Finish coat
  • White plaster finish

Exterior Finish Materials

  • Stone veneer
  • Brick veneer
  • Wood siding accents
  • Exterior paint
  • Waterproof coatings
  • Exterior trim

PHASE 12 – INTERIOR FINISHES

Flooring

  • Large format porcelain tile
  • Hardwood flooring
  • Stone flooring
  • Bathroom tile
  • Mosaic tile
  • Stair treads
  • Baseboards

Cabinets & Counters

  • Kitchen cabinets
  • Bathroom vanities
  • Pantry shelving
  • Quartz counters
  • Granite counters
  • Marble slabs
  • Cabinet hardware

Interior Doors

  • Solid core doors
  • Barn doors
  • Pocket doors
  • Closet doors
  • Door hardware

Painting

  • Primer
  • Interior paint
  • Exterior paint
  • Waterproof coatings
  • Wood stain

PHASE 13 – GLASS & RAILINGS

Glass Systems

  • Tempered glass railings
  • Stainless steel railing posts
  • Copper railing cap
  • Balcony railing glass
  • Pool glass fencing
  • Stair glass panels

PHASE 14 – POOL, SPA & WATER FEATURES

Pool Equipment

  • Pool shell concrete
  • Rebar cage
  • Tile finish
  • Pool plaster
  • Pool pumps
  • Pool filters
  • Pool heater
  • Spa jets
  • LED pool lighting
  • Auto fill systems
  • Drain systems
  • Dolphin water feature

PHASE 15 – LANDSCAPING & EXTERIOR

Landscaping

  • Palm trees
  • Lemon tree
  • Strawberry garden
  • Irrigation system
  • Drip irrigation
  • Landscape lighting
  • Artificial turf
  • Planters
  • Retaining walls
  • Exterior pavers
  • Dock improvements

Outdoor Features

  • Fire pit
  • Outdoor kitchen
  • BBQ
  • Patio heaters
  • Exterior furniture
  • Boat dock
  • Seawall railing
  • Hummingbird birdhouse
  • Lamp posts

PHASE 16 – FINAL INSPECTIONS & CLOSEOUT

Final Items

  • Final paint touch up
  • Final cleaning
  • Appliance installation
  • Window cleaning
  • Final grading
  • Final inspection signoff
  • Occupancy certificate
  • Warranty package
  • As-built drawings
  • Lien releases

BUYER & SELLER REMODEL QUESTIONNAIRE

General Information

  1. Property address?
  2. Square footage?
  3. Year built?
  4. Existing permits?
  5. HOA restrictions?
  6. Coastal Commission restrictions?
  7. Flood zone requirements?
  8. Desired budget?
  9. Desired completion date?
  10. Financing secured?

Remodel Goals

  1. Full remodel or partial remodel?
  2. Add second story?
  3. Expand square footage?
  4. Add ADU?
  5. Add pool or spa?
  6. Add elevator?
  7. Open floor plan desired?
  8. Waterfront improvements desired?
  9. Dock improvements needed?
  10. Smart home systems desired?

Structural Questions

  1. Existing foundation cracks?
  2. Roof leaks?
  3. Water intrusion?
  4. Termite damage?
  5. Settlement issues?
  6. Structural engineer review completed?
  7. Existing plans available?

Design Questions

  1. Desired architectural style?
  2. Preferred flooring?
  3. Preferred cabinets?
  4. Preferred windows?
  5. Roofing material preference?
  6. Outdoor kitchen desired?
  7. Glass railings desired?
  8. Landscaping style?

Budget Questions

  1. Construction budget?
  2. Soft cost budget?
  3. Permit fee allowance?
  4. Contingency allowance?
  5. Financing type?

Contractor Questions

  1. Who manages daily construction?
  2. Desired communication schedule?
  3. Weekly meetings requested?
  4. Preferred subcontractors?
  5. Insurance requirements?

CALIFORNIA ICC & CITY CODE CHECKLIST

Required California Codes

  • CBC California Building Code
  • CRC California Residential Code
  • CEC California Electrical Code
  • CPC California Plumbing Code
  • CMC California Mechanical Code
  • CFC California Fire Code
  • CALGreen Code
  • Title 24 Energy Code

Typical Permit Requirements

  • Architectural approval
  • Structural engineering approval
  • Energy compliance approval
  • Mechanical permit
  • Plumbing permit
  • Electrical permit
  • Coastal approval
  • Grading permit
  • Encroachment permit
  • Pool permit
  • Dock permit
  • Sewer connection approval
  • Water department approval

Typical Inspections

  • Foundation inspection
  • Underground plumbing inspection
  • Underground electrical inspection
  • Framing inspection
  • Shear inspection
  • Roof inspection
  • Insulation inspection
  • Lath inspection
  • Drywall inspection
  • Electrical final
  • Plumbing final
  • Mechanical final
  • Pool inspection
  • Final building inspection

RECOMMENDED WATERFRONT CONSTRUCTION ITEMS

Waterfront Protection

  • Marine grade hardware
  • Stainless steel fasteners
  • Epoxy coated steel
  • Waterproof deck systems
  • Coastal rated windows
  • Salt air resistant coatings
  • Flood vents
  • Corrosion resistant metals

ESTIMATING NOTES

Average high-end waterfront remodel pricing in Orange County may range:

  • $700 to $1,500+ per sq ft

depending on:

  • Structural complexity
  • Coastal requirements
  • Engineering requirements
  • Waterfront conditions
  • Material selections
  • Steel beam requirements
  • Dock improvements
  • Pool & spa scope
  • Architectural detailing
  • Custom cabinetry
  • Luxury finishes

Final pricing requires:

  • Complete permit drawings
  • Structural calculations
  • Engineering review
  • Site investigation
  • Subcontractor bidding
  • Material takeoffs
  • City review comments

NEVER ENOUGH OVERTIME CONTRACTORS

Bob Austin
California General Contractor License B570642
949-740-4185

Luxury Coastal Homes
Waterfront Remodels
ADU Design Concepts
Owner Representation
Construction Consulting
Architect Coordination



Realtors for Connection

Realtors

Building starts here and why hire a GC Bob Austin

SUB-CONTRACTORS

Realtors referrals for Orange county and California 


please emails us for list of realtors

SUB-CONTRACTORS

Building starts here and why hire a GC Bob Austin

SUB-CONTRACTORS

LIST OF SUB CONTRACTORS

MENTION NEVER ENOUGH OVERTIME TO GET A $1000.00 DISCOUNT WITH SIGNED CONTRACT WITH NEVER ENOUGH OVERTIME


S&J Plastering Contractors, Inc.
10655 Stanford Avenue
Garden Grove, CA  92840
Phone - 714-761-3173
Fax - 714-741-4949
CA License #749964


Taylor Brothers Architectural Products

2934 Riverside Dr.

Los Angeles, CA 90039

C: 310-661-0900

O: 323-805-0200

greg@taybros.com

www.taybros.com


Daniel Calton

SoCal Stairs

C# 562-296-7865

calton@socalstairs.com


Joseph Cole

Atlas Sheet Metal, Inc.

11614 Martens River Circle

Fountain Valley, CA 92708

O: 949.600.8787

www.atlassheetmetal.com

Outlook-qc2tsf5i.png


Pacific Contracting & Development Inc.

Mailing Address: 245 S. 1st ave

Upland, CA, 91786

Office Phone: (949) 549-5808

www.pacificcadinc.com

Email: pacific@pacificcadinc.com

License # 1002736


OC Decks16582 Gothard Street, Suite i, Huntington Beach, CA 92647 

Phone:  714.848.7859 | Cell:  949.616.9966 

E-mail: ocdecks@gmail.com  | Website:  ocdecks.com


Tasha Wagner

CABANA CONCEPTS
(760) 512-DOOR
www.cabanaconcepts.com
3060 Industry St, Ste 106, Oceanside, CA 92054


FOLLOW US!
instagram.com/thecabanaconcept
facebook.com/cabanaconcepts
twitter.com/cabanaconcepts


CRANK WATERPROOFING

134 Commercial Way
Costa Mesa, CA 92627 (949) 646-9356 info@crankdeckandroof.com www.crankdeckandroof.com


DRYWALL

Hector Flores
President 

Flores Quality Drywall, Corp
16075 Rawhide Ln, 

Riverside, CA, 92504

323.440.0395 Mobile

License No. 1000495


Lake Havasu Framer

Randall Perry

Kellie Perry


RJ Perry Custom Framing LLC

DBA Bridgewater Builders

2765 Kiowa Blvd N

LHC, AZ 86404

P:928-486-6423(Any questions please call)

office: 928-854-5262

F: 928-680-2839


WINDOWS AND DOORS

Vanessa Padilla
Inside Sales Representative
694 N. Lake Havasu Ave
Lake Havasu City, AZ  86403
vanessa.padilla@bldr.com

928-855-4061 | BLDR.com


we have full list of sub-contractors and please email us for who we use and would use


all sub-contractors must be work comp insured and licensed and active with CA





House for sale in Huntington Beach building idea for buyers

Build list for all building

Build list for all building

Build list for all building

CALIFORNIA CUSTOM WATERFRONT HOME

COMPLETE CONSTRUCTION MATERIAL LIST

BUYER / SELLER REMODEL QUESTIONNAIRE

CITY PERMIT & ICC CODE CHECKLIST

Prepared For:
Never Enough Overtime Contractors
Bob Austin – CA License B570642
949-740-4185

Project Concept:
16104 Tortola Cir
Huntington Beach, CA 92649
Custom 2 Story Waterfront Remodel
Approx. 2,571 Sq Ft

IMPORTANT NOTICE

This document is a conceptual construction planning guide only.
Final plans, engineering, Title 24, structural calculations, soils reports, energy compliance, coastal review, and permit drawings must be prepared and stamped by licensed California professionals before submission to the City of Huntington Beach.

All construction must comply with:

  • California Building Code (CBC)
  • California Residential Code (CRC)
  • California Electrical Code (CEC)
  • California Plumbing Code (CPC)
  • California Mechanical Code (CMC)
  • California Fire Code (CFC)
  • California Green Building Standards Code (CALGreen)
  • California Energy Code Title 24
  • Local Huntington Beach requirements
  • Coastal Commission requirements
  • ICC International Building Code standards

PHASE 1 – PRE-CONSTRUCTION & DESIGN

Professional Services

  • Architect
  • Structural engineer
  • Civil engineer
  • Soils engineer
  • Surveyor
  • Geotechnical consultant
  • Coastal consultant
  • MEP engineer
  • Landscape architect
  • Pool engineer
  • Energy consultant Title 24
  • Interior designer
  • General contractor
  • Permit expeditor
  • Environmental consultant
  • Insurance provider

Site Investigation

  • Property survey
  • Topographic survey
  • Utility locate
  • Soils testing
  • Existing sewer inspection
  • Existing dock inspection
  • Flood elevation review
  • Harbor setback verification
  • Easement review
  • Coastal restrictions review

Permit Documents Needed

  • Site plan
  • Architectural plans
  • Structural calculations
  • Truss calculations
  • Energy calculations
  • Mechanical plans
  • Electrical plans
  • Plumbing plans
  • Drainage plans
  • Landscape plans
  • Pool plans
  • Fire sprinkler plans
  • Coastal approval package
  • Stormwater BMP plan
  • Waste management plan

PHASE 2 – DEMOLITION

Demolition Materials & Equipment

  • Demo dumpsters
  • Portable toilets
  • Temporary fencing
  • Dust barriers
  • Safety cones
  • Erosion control wattles
  • Silt fencing
  • Excavator
  • Skid steer
  • Jackhammers
  • Concrete saws
  • Dump trailers
  • Temporary power poles
  • Temporary water supply

Demo Scope

  • Remove existing drywall
  • Remove roofing
  • Remove windows
  • Remove doors
  • Remove cabinets
  • Remove plumbing fixtures
  • Remove electrical wiring
  • Remove flooring
  • Remove landscaping
  • Remove concrete flatwork
  • Remove pool equipment if needed
  • Remove damaged framing

PHASE 3 – SITE WORK & FOUNDATION

Excavation

  • Excavator rental
  • Soil export trucks
  • Compaction equipment
  • Base rock
  • Gravel
  • Drain rock
  • Geo fabric

Foundation Materials

  • Rebar #4
  • Rebar #5
  • Rebar #6
  • Anchor bolts
  • Hold downs
  • Simpson Strong-Tie hardware
  • Vapor barrier
  • Concrete forms
  • Form stakes
  • Form release oil
  • Concrete pump
  • Ready mix concrete
  • Footing drains
  • Waterproofing membrane
  • Expansion joint material
  • Slab insulation
  • Copper grounding rod
  • Ufer ground rebar

Underground Utilities

  • ABS sewer pipe
  • PVC drain pipe
  • Copper water pipe
  • Gas pipe
  • Electrical conduit
  • Low voltage conduit
  • Irrigation sleeves
  • Catch basins
  • Area drains
  • Trench drains
  • Cleanouts

PHASE 4 – STRUCTURAL FRAMING

Lumber Materials

Foundation & Floor Framing

  • Pressure treated sill plates
  • 2x6 studs
  • 2x8 joists
  • 2x10 joists
  • 2x12 joists
  • LVL beams
  • PSL beams
  • Glue laminated beams
  • Rim joists
  • Blocking
  • Bridging
  • Floor sheathing plywood

Wall Framing

  • 2x4 walls
  • 2x6 exterior walls
  • Headers
  • King studs
  • Jack studs
  • Cripple studs
  • Fire blocking
  • Structural sheathing
  • Shear wall plywood
  • Nailing hardware

Roof Framing

  • Roof rafters
  • Roof trusses
  • Ridge beams
  • Hip rafters
  • Valley rafters
  • Roof blocking
  • Fascia boards
  • Roof sheathing
  • Hurricane clips
  • Structural connectors

Steel Materials

  • W8 steel beams
  • W10 steel beams
  • W12 steel beams
  • Steel posts
  • Steel plates
  • Moment frames
  • Knife plates
  • Steel weld plates
  • Anchor plates
  • Simpson hardware
  • Structural bolts

Framing Hardware

  • Joist hangers
  • HD hold downs
  • Strap ties
  • Framing nails
  • Structural screws
  • SDS screws
  • Epoxy anchors
  • Seismic clips

PHASE 5 – WINDOWS, DOORS & WATERPROOFING

Windows

  • Black aluminum windows
  • Tempered glass
  • Low-E glass
  • Sliding glass doors
  • Bathroom privacy windows
  • Skylights
  • Glass railing systems

Exterior Doors

  • Front entry pivot door
  • French doors
  • Pocket doors
  • Garage entry doors
  • Waterproof thresholds

Waterproofing

  • Self adhered membrane
  • Flashing tape
  • Liquid waterproofing
  • Window pans
  • Metal flashing
  • Copper flashing
  • Waterproof deck coating
  • Drain mat systems
  • Caulking
  • Sealants

PHASE 6 – ROOFING

Roofing Materials

  • Clay roof tile
  • Concrete roof tile
  • Metal roofing
  • Copper chimney caps
  • Roof underlayment
  • Ice shield membrane
  • Roof vents
  • Ridge vents
  • Roof flashing
  • Gutters
  • Downspouts
  • Scuppers
  • Overflow drains
  • Copper drains

PHASE 7 – PLUMBING

Plumbing Rough

  • Copper piping
  • PEX piping
  • ABS waste lines
  • Gas lines
  • Hose bibs
  • Main water shutoff
  • Pressure regulators
  • Tankless water heater
  • Recirculation pump
  • Shower valves
  • Floor drains
  • Cleanouts
  • Backflow preventers

Plumbing Fixtures

  • Toilets
  • Bathtubs
  • Freestanding tubs
  • Faucets
  • Kitchen sinks
  • Bar sinks
  • Shower heads
  • Body sprays
  • Exterior shower
  • Pool plumbing
  • Spa plumbing

PHASE 8 – ELECTRICAL

Main Electrical

  • Main service panel
  • Sub panels
  • Meter panel
  • Grounding system
  • Copper grounding wire
  • Electrical conduit
  • Romex wire
  • MC cable
  • Exterior disconnects

Electrical Fixtures

  • Recessed lights
  • Pendant lights
  • Chandeliers
  • Exterior sconces
  • Landscape lights
  • Dock lighting
  • Motion sensors
  • Ceiling fans
  • Bathroom exhaust fans
  • TV wiring
  • Audio speakers
  • Smart home systems
  • Security cameras
  • EV chargers

PHASE 9 – HVAC & MECHANICAL

HVAC Materials

  • HVAC units
  • Mini split systems
  • Ductwork
  • Insulated flex duct
  • Supply registers
  • Return air grills
  • Thermostats
  • Ventilation fans
  • Exhaust vents
  • Condensate drains
  • Sound attenuation systems

PHASE 10 – INSULATION & DRYWALL

Insulation

  • Batt insulation
  • Rigid insulation
  • Spray foam insulation
  • Sound insulation
  • Attic insulation

Drywall

  • 5/8 drywall
  • Moisture resistant drywall
  • Cement board
  • Corner bead
  • Joint compound
  • Texture materials

PHASE 11 – STUCCO & EXTERIOR FINISHES

Stucco Materials

  • Building paper
  • Lath wire
  • Weep screed
  • Expansion joints
  • Stucco scratch coat
  • Brown coat
  • Finish coat
  • White plaster finish

Exterior Finish Materials

  • Stone veneer
  • Brick veneer
  • Wood siding accents
  • Exterior paint
  • Waterproof coatings
  • Exterior trim

PHASE 12 – INTERIOR FINISHES

Flooring

  • Large format porcelain tile
  • Hardwood flooring
  • Stone flooring
  • Bathroom tile
  • Mosaic tile
  • Stair treads
  • Baseboards

Cabinets & Counters

  • Kitchen cabinets
  • Bathroom vanities
  • Pantry shelving
  • Quartz counters
  • Granite counters
  • Marble slabs
  • Cabinet hardware

Interior Doors

  • Solid core doors
  • Barn doors
  • Pocket doors
  • Closet doors
  • Door hardware

Painting

  • Primer
  • Interior paint
  • Exterior paint
  • Waterproof coatings
  • Wood stain

PHASE 13 – GLASS & RAILINGS

Glass Systems

  • Tempered glass railings
  • Stainless steel railing posts
  • Copper railing cap
  • Balcony railing glass
  • Pool glass fencing
  • Stair glass panels

PHASE 14 – POOL, SPA & WATER FEATURES

Pool Equipment

  • Pool shell concrete
  • Rebar cage
  • Tile finish
  • Pool plaster
  • Pool pumps
  • Pool filters
  • Pool heater
  • Spa jets
  • LED pool lighting
  • Auto fill systems
  • Drain systems
  • Dolphin water feature

PHASE 15 – LANDSCAPING & EXTERIOR

Landscaping

  • Palm trees
  • Lemon tree
  • Strawberry garden
  • Irrigation system
  • Drip irrigation
  • Landscape lighting
  • Artificial turf
  • Planters
  • Retaining walls
  • Exterior pavers
  • Dock improvements

Outdoor Features

  • Fire pit
  • Outdoor kitchen
  • BBQ
  • Patio heaters
  • Exterior furniture
  • Boat dock
  • Seawall railing
  • Hummingbird birdhouse
  • Lamp posts

PHASE 16 – FINAL INSPECTIONS & CLOSEOUT

Final Items

  • Final paint touch up
  • Final cleaning
  • Appliance installation
  • Window cleaning
  • Final grading
  • Final inspection signoff
  • Occupancy certificate
  • Warranty package
  • As-built drawings
  • Lien releases

BUYER & SELLER REMODEL QUESTIONNAIRE

General Information

  1. Property address?
  2. Square footage?
  3. Year built?
  4. Existing permits?
  5. HOA restrictions?
  6. Coastal Commission restrictions?
  7. Flood zone requirements?
  8. Desired budget?
  9. Desired completion date?
  10. Financing secured?

Remodel Goals

  1. Full remodel or partial remodel?
  2. Add second story?
  3. Expand square footage?
  4. Add ADU?
  5. Add pool or spa?
  6. Add elevator?
  7. Open floor plan desired?
  8. Waterfront improvements desired?
  9. Dock improvements needed?
  10. Smart home systems desired?

Structural Questions

  1. Existing foundation cracks?
  2. Roof leaks?
  3. Water intrusion?
  4. Termite damage?
  5. Settlement issues?
  6. Structural engineer review completed?
  7. Existing plans available?

Design Questions

  1. Desired architectural style?
  2. Preferred flooring?
  3. Preferred cabinets?
  4. Preferred windows?
  5. Roofing material preference?
  6. Outdoor kitchen desired?
  7. Glass railings desired?
  8. Landscaping style?

Budget Questions

  1. Construction budget?
  2. Soft cost budget?
  3. Permit fee allowance?
  4. Contingency allowance?
  5. Financing type?

Contractor Questions

  1. Who manages daily construction?
  2. Desired communication schedule?
  3. Weekly meetings requested?
  4. Preferred subcontractors?
  5. Insurance requirements?

CALIFORNIA ICC & CITY CODE CHECKLIST

Required California Codes

  • CBC California Building Code
  • CRC California Residential Code
  • CEC California Electrical Code
  • CPC California Plumbing Code
  • CMC California Mechanical Code
  • CFC California Fire Code
  • CALGreen Code
  • Title 24 Energy Code

Typical Permit Requirements

  • Architectural approval
  • Structural engineering approval
  • Energy compliance approval
  • Mechanical permit
  • Plumbing permit
  • Electrical permit
  • Coastal approval
  • Grading permit
  • Encroachment permit
  • Pool permit
  • Dock permit
  • Sewer connection approval
  • Water department approval

Typical Inspections

  • Foundation inspection
  • Underground plumbing inspection
  • Underground electrical inspection
  • Framing inspection
  • Shear inspection
  • Roof inspection
  • Insulation inspection
  • Lath inspection
  • Drywall inspection
  • Electrical final
  • Plumbing final
  • Mechanical final
  • Pool inspection
  • Final building inspection

RECOMMENDED WATERFRONT CONSTRUCTION ITEMS

Waterfront Protection

  • Marine grade hardware
  • Stainless steel fasteners
  • Epoxy coated steel
  • Waterproof deck systems
  • Coastal rated windows
  • Salt air resistant coatings
  • Flood vents
  • Corrosion resistant metals

ESTIMATING NOTES

Average high-end waterfront remodel pricing in Orange County may range:

  • $700 to $1,500+ per sq ft

depending on:

  • Structural complexity
  • Coastal requirements
  • Engineering requirements
  • Waterfront conditions
  • Material selections
  • Steel beam requirements
  • Dock improvements
  • Pool & spa scope
  • Architectural detailing
  • Custom cabinetry
  • Luxury finishes

Final pricing requires:

  • Complete permit drawings
  • Structural calculations
  • Engineering review
  • Site investigation
  • Subcontractor bidding
  • Material takeoffs
  • City review comments

NEVER ENOUGH OVERTIME CONTRACTORS

Bob Austin
California General Contractor License B570642
949-740-4185

Luxury Coastal Homes
Waterfront Remodels
ADU Design Concepts
Owner Representation
Construction Consulting
Architect Coordination

Blog

Copyright © 2026 Never Enough Overtime  mobile-949-740-4185 general contractor b 570642 - All Rights Reserved.

Powered by

  • Gallery

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept